Nestle
Simpson have worked with Nestle for more than 25 years, delivering projects across their UK facilities, including Dalston, Ashbourne, Tutbury and York. Our work has included structural alterations, internal remodelling, office refurbishment and fit-out projects, often carried out immediately alongside operational food production lines. By collaborating closely with their food production teams, we carefully plan and execute our works to ensure full compliance with food hygiene requirements and to safeguard product quality at all times.
Nestle Product Technology Centre: Simpson completed the construction works to provide Nestlé with a new Product Technology Centre incorporating a creative office environment and industrial production space to inspire and stimulate the office staff, with ambiance of the building being a mixture of natural light and space, providing a calming dynamic and inspirational setting.
The Construction works for this new purpose built, modern office consisted of a three-storey extension, which houses offices, meeting rooms and creative suites along with a product testing kitchen. This new building has a “wrapping” design, and with the flashes of white and yellow and fully glazed facade providing a bold statement from the first glimpse. This theme continues with the new internally glazed, tree lined boulevard and reception area creating the main focal point linking together the original spaces in the building to the new extension.
Refurbishment works were carried out in the existing building to the office areas, changing rooms, showers, lockers and toilets along with external landscaping and link corridor to the Insight centre previously carried out by Simpson.
Nestle House: We have delivered several phases of work at Nestle House, while the building remained operational. Works have included:
· Strip-out, refurbishment and reconfiguration of office accommodation across five floors
· Upgrades to the existing canteen and kitchen facilities
· Creation of a new wellness suite, incorporating a gymnasium and dance studio
· Remodelling of the outdoor terrace and carpark
The programme was carefully managed to minimise disruption to day-to-day operations, with each area fully completed and handed over before the next phase commenced.
Drawing on our experience, we streamlined the scope and identified value-engineering opportunities across several work packages, including ceilings, partitions, flooring, lighting and M&E services.
· Working with the M&E contractor, we progressed the design to allow off-site manufacture of service installations. These were delivered in cassette form, reducing on-site programme duration and limiting time spent working at height.
· Branding screens originally designed in powder-coated metalwork were re-engineered as sprayed timber panels. Samples were produced for approval, achieving a significant cost saving without compromising appearance.
Nestle Insight Centre: We extended Nestle’s Insight Centre to either side of the existing development.The programme of works included:
· Construction of a new structural steel portal frame with masonry brickwork infill
· Installation of a profiled steel sheeting roof and aluminium windows
· An in-situ cast concrete floor slab
· Creation of a cinema space and supermarket display area
Nestle, Crawley: The conversion and refurbishment of an existing space to support research and development activities, including:
· Catering training facilities
· Kitchen areas
· New office accommodation
All works were carried out adjacent to live operational areas, requiring robust segregation measures and non-disruptive working practices.

Forest Veterinary Centre
The project involved extending and fitting out an existing steel-framed, cladded unit to create a new veterinary practice. The works included:
• Drainage, electrical and plumbing installations
• Provision of a platform lift
• The hygienic specification fit-out and finishes
The extension was constructed from multiple skins of block work to form the hot ward and disposal/storage areas.
The Trespa worktops, cat podium, dog ward surrounds and reception desk were manufactured in our joinery workshop.

Pawra
The project consisted of the fit-out of an existing retail showroom for animal wellness functions and support facility purpose. The existing building was a vacant ground floor unit of approximately 390m2 and was in good order.
The works were carried out over 2 phases – enabling and fit-out – This approach was taken to enable planning matters to be resolved and allow the acousticians access to develop the required designs. During the fit-out phase of the works, the following works were undertaken:
· Internal walls & Ceilings
· Acoustic ceiling treatments
· Floor preparation and associated finishes
· Decoration
· Hygienic wall cladding
· Mechanical, Electrical & Plumbing installations
· Joinery manufacture and installation
· Specialist joinery manufacture – Booths,Banquette Seating, Podiums, Reception Desks
· Specialist installations - Hydrotherapy treadmill units and dog grooming equipment.
Hull Maritime Museum
Simpson completed the restoration and reordering of the Grade II Listed Hull Maritime Museum and creation of a new collections store within the 3-storey Dock Office. The project is part of the wider Hull: Yorkshire’s Maritime City Master Redevelopment Plan, funded by Hull City Council and The Heritage Lottery fund.
The project has seen the creation of a central glass atrium which is open for all visitors, along with access to one of the cupola’s which showcases the panoramic rooftop views across the city.
As part of the project, new mechanical and electrical services were installed. To protect the historic fabric of the building, including its limestone walls and vaulted ceilings, the new services were installed within the duct runs in the floor.
Significant roofing repair and replacement was required. Scaffolding was installed to all 3 elevations and inspections of stonework were conducted. All elevations were DOFF cleaned and defective stonework repaired and replaced. While external repairs progressed, further scaffold was erected to the 3 cupolas and scaffold truss beams spanned the full roof area to provide a watertight cover. The lead was removed from each cupola and defective timber fully repaired or replaced, before installing the repurposed lead.
Recognising the museum’s cultural significance to the people of Hull, we embedded social value into the construction process. This included creating apprenticeships, offering work placements, hosting site visits, employing local labour, and making charitable donations.