Hollywood Bowl
Simpson have completed several Hollywood Bowl schemes, with projects ranging from small joinery works to full bowling alley fit-outs.
Our most recent project saw the fit-out of a new Hollywood Bowl in the live Chimes Shopping Centre, Uxbridge. The new leisure facility has 22 bowling lanes, 4 duck pin lanes, a reception, bar, diner, amusement arcade, offices and a general concourse area.
The works included:
- The Full Fit-out
- M&E Installation
- Fire-stopping works
- All decoration and finishes
Our joiners’ shop manufactured bespoke joinery elements, including fire doors and frames, bar and reception, feature rafts, prize display wall and the team room kitchen.
‘I could not ask for better people to work with, they were professional at all times and anything that was requested was actioned immediately, they adhered to any site rules that were in place and any questions that were required they asked and followed the instructions to a T.
They have portrayed Simpson in the best light possible and I have done this job for nearly 27 years and must say they are one of the best teams I have ever had the pleasure of working with and would 1000% recommend Simpson to others, the team are a credit to Simpson so please do pass on my thanks.’
Peter Hutton – Regional Facilities Manager – Sanderson Wetherall
Recommended Projects
Sainsbury's
Our relationship with Sainsbury’s began in 2016, following their acquisition of Argos. Having worked with Argos since 1993, we were able to proactively share our knowledge and experience of the Argos estate with Sainsbury’s and their other main contractors. This collaboration strengthened our partnership, and we are now proud to be recognised as one of their Platinum suppliers, successfully delivering projects across their multiple workstreams.
Our current role focuses on supporting the development of Sainsbury’s national property portfolio and helping to enhance their multi-brand vision through new store fit-outs, refurbishments and an ongoing programme of initiative-led roll-out works.
Key initiatives we’ve been involved in include:
- Store-in-Store rollouts.
- Local Fulfilment Centres
- Refrigeration Refurbishment Schemes
- Carbon neutral initiatives
- Brand standard upgrades
In 2025 we delivered Sainsbury's Witney, a new concept store. This involved a full remodel of the existing superstore, including external façade and roof repairs, and the creation of additional space to accommodate Argos, Starbucks and Timpsons. Refrigeration and mechanical plant systems were replaced, with new cold rooms installed to support Sainsbury’s drive towards net zero. The Works were carefully phased to minimise disruption, with the store only closing for the final two weeks to allow for fridge and freezer replacements and restocking ahead of store launch.
Since Witney, we have also completed their newest flagship superstore at Wynyard, Billingham. The impressive 48,330 sq. ft. store has been built to Sainsbury’s latest “MBS” specification, setting a new benchmark for quality and sustainability. featuring latest design, energy-efficient standards, and advanced operational features, this store represents the very best of Sainsbury’s retail experience.
Bradford Arts Centre
Formally known as ‘Kala Sangam’, Simpson completed the redevelopment of the newly named ‘Bradford Arts Centre’.
The 75 week program has seen an extensive reconfiguration and upgrade to the existing building facilities creating a state-of-the-art, space for artists, audiences and businesses, reconnecting the building and arts centre to the local community.
The project has seen the creation of a new theatre, five dance studios, a new central staircase and a permanent home for volunteer-led community radio station Bradford Community Broadcasting (BCB).
The introduction of a new entrance, two new lifts and a dedicated changing place facility now ensures the building is fully accessible for the first time in its 140-year history.
Endsleigh Convent
Built in the late 1800s, Endsleigh Convent in Filey served as a convent and holiday retreat for the Sisters of Mercy of the Middlesbrough Diocese.
The goal was to sensitively redevelop the historic structure into five high-end residential apartments, preserving its architectural character while introducing modern functionality and comfort. The project aimed to honour the building’s heritage while adapting it for contemporary coastal living.
The development has seen
- Internal remodelling carried out across all floors to create 5 spacious, open-plan apartments.
- Extensive structural works to support the new layouts and to accommodate a platform lift serving all levels.
- The former chapel underwent a thoughtful extension, transforming it into a unique residence with “upside-down” living:
The redevelopment of Endsleigh Convent successfully blends heritage preservation with modern design, creating a collection of distinctive homes that respect the building’s past while embracing its future. The project stands as a model for adaptive reuse in a sensitive coastal setting.