Project Info
Client
G Leeds Valley Park
Location
Leeds
Completed
January 2023
Contact
Share

Darwin House

We under took a comprehensive refurbishment of the ground floor at Darwin House, delivering:

• A new reception area;

• Gym, toilets and shower facilities;

• A Café space;

• Cat-A office accommodation

•Glazed screens and bespoke joinery elements, including: the reception desk,frames, doors and a feature walkway installation

The works included demolition of existing stud and block walls, full mechanical and electrical strip out, and refurbishment. The walkway was originally to be constructed from a series of solid oak goalposts. This was value-engineered,using the expertise of our joinery workshop, and replaced with light weight expanded foam clad in oak veneers, maintaining the aesthetic while reducing the cost.

As the building remained occupied throughout, with tenants on both the ground and upper floors, we implemented robust measures to ensure safe access and maintain a secure, compliant working environment. This allowed daily operations to continue uninterrupted during the programme of works.

Contact Us

Let's Build
Tomorrow, Today!