Simpson complete work at Hull Maritime Museum

Heritage & Restoration

After 3 years on site, Simpson have now completed their part in the refurbishment to the Grade II listed Hull Maritime Museum.

The work completed to the Museum has seen:

Restoration of the stonework, through poulticing/repairing and replacing significant stonework using traditional stonemason methods.

Replacement of the lead to the cupolas and timber structure inside and restoration of the existing ridge tiles while maintaining the original features to the building.

Installation of new mechanical and electrical services.

Opening up of the basement and 2nd floor to create 50% more public/exhibition space.

Repair and decoration throughout, including the creation a new café for visitors.

Reclaiming the central courtyard to create a stunning central glass atrium which will be open to visitors, along with access to one of the cupola’s which showcases the panoramic rooftop views across the city.

It has been a great pleasure to have been a part of the ‘Hull Maritime master redevelopment plan’

Let's Build
Tomorrow, Today!